News

In the News from Panama

$300 Million Corredor Sur Expansion Enters Environmental Review Phase

Panama’s Corredor Sur is gearing up for a massive transformation. The $300 million expansion project has officially entered the environmental review process, a crucial step before construction can begin.
The ambitious proposal, managed by the National Highway Company (ENA), aims to drastically improve mobility along one of Panama City’s most vital traffic arteries. The project includes major road widenings, new access points, and the implementation of a modern “Free Flow” electronic toll system.
According to the environmental impact study, the project contemplates new structures and modifications to six interchanges. The most significant changes will take place on the marine viaduct, where the plan outlines four lanes heading towards Paitilla and three lanes towards Tocumen.
Further down the highway, the stretch from Costa del Este to Tocumen will be expanded to three lanes in each direction. Additional lanes will be built in strategic points like Costa del Este and Ciudad Radialto handle the increasing vehicle capacity.
Because the expansion affects the marine and coastal areas, the environmental study recognizes potential risks such as noise, vibrations, and water turbidity. To mitigate these effects, the project will implement strict environmental controls, including water quality monitoring, turbidity curtains, reforestation, and wildlife rescue programs.
The exact start date for the construction depends on the successful completion of this environmental evaluation and the acquisition of the corresponding permits. Once approved, the Corredor Sur will be on its way to offering a much needed solution for Panama’s urban mobility challenges.

5 Things to Know

  1. The expansion represents a $300 million investment.
The comprehensive project includes new accesses, interchange modifications, and road widening.
  1. The marine viaduct is expanding.
The overwater section will feature four lanes heading toward Paitilla and three lanes toward Tocumen.
  1. Costa del Este and Tocumen get three lanes.
The route connecting Costa del Este to Tocumen will expand to three lanes in each direction, with extra capacity in key zones.
  1. A “Free Flow” toll system will be installed.
The project will upgrade to a modern electronic tolling system to help reduce traffic bottlenecks.
  1. Environmental protection measures are included.
The plan incorporates water monitoring, turbidity curtains, and reforestation to protect the marine ecosystem during construction.
Corredor Sur Enters Environmental Process